LCO2 Terminal & CO2 Shipping Hub Financial Model (Excel) – Project Finance for CCS Infrastructure
The LCO2 Terminal Financial Model is a lender-ready Excel project finance model for a liquefied CO2 (LCO2) storage and shipping hub with more than 5 million tonnes per annum of capacity. It is built for carbon capture and storage (CCS) developers, infrastructure investors, lenders and advisers. The model follows the full project life cycle: development, a 24-month monthly construction period, five years of monthly operations with annual roll-ups, and annual forecasts to Year 20. Every date in the model is driven by one Model Start Date, so you can re-time the whole project with a single input.
Financial Model For An LCO2 Terminal CCS Project
The model covers the whole CCS terminal and shipping value chain. It starts from CO2 supply contracted with industrial emitters, then runs through terminal throughput, tank storage and inventory, marine operations and vessel calls, and utilities such as refrigeration, pumping and boil-off compression. CO2 losses are tracked and checked with a full mass balance. Revenue is built up from receipt, handling, storage, loading, unloading, capacity reservation, take-or-pay, shipping and ancillary tariffs. These feed a fully integrated Income Statement, Balance Sheet and Cash Flow Statement that balance in every period.
For the investment decision and lender financing, the model includes a non-circular debt sizing engine. It sizes debt to DSCR, LLCR, PLCR, gearing and leverage limits, and sculpts repayments to cash flow. The model also includes reserve accounts (DSRA and MMRA), a cash distribution waterfall with lock-up tests, and Project and Equity DCF valuations. Outputs include IRR, NPV, MOIC and payback. There are six switchable scenarios, live sensitivity tables, a KPI dashboard with charts and more than 70 model integrity checks. It is a complete, transparent valuation and financing tool for LCO2 terminal and CO2 hub projects.
What’s Inside – Tab by Tab
01. Cover & Control
The Cover & Control tab is the model’s command centre. It records the project and model information and shows the key milestone dates. From here, users select scenarios, currencies and sub-cases from drop-down menus and turn seven model switches on or off. Headline outputs, including CAPEX, funding, IRRs, NPVs, DSCRs and the overall integrity status, update instantly.
- Project and model information, including the SPV, capacity, purpose and confidentiality
- Drop-down scenario, currency, inflation, financing, tax, construction and operational selectors
- Seven model switches, such as construction period, tax losses and debt sculpting
- Live headline outputs and the model integrity status
- A colour-coding legend for inputs, formulas and links
02. Timeline
The Timeline tab drives every date in the financial model from one Model Start Date. Development, construction, commissioning, COD, operating and debt milestones are calculated automatically. A period engine creates monthly, FY Total and annual columns, along with the flags that switch construction, operations, debt drawdown, repayment and terminal-period calculations on and off.
- One master start date re-dates the entire model
- Development, construction, operating and debt milestones
- Construction delay, COD delay, life extension and tenor extension controls
- Period start and end dates, days, year fractions and financial years
- Construction, operating, drawdown, repayment and terminal flags
LCO2 Terminal Production Revenues
03. Assumptions
The Assumptions tab holds the base-case inputs for the LCO2 terminal. It covers general, macroeconomic, FX, operational, commercial, cost, tax, financing, valuation and discounting assumptions. Escalation indices for tariffs, opex, maintenance, insurance, labour, electricity, fuel, shipping and FX compound each financial year, so all costs and revenues are in consistent nominal terms.
- Inflation, FX rates and the share of costs incurred in EUR
- Tariffs, take-or-pay terms, merchant discount and tariff indexation
- Corporate tax, WHT, VAT, interest limitation and loss rules
- Debt pricing, fees, gearing, lock-up DSCR and DSRA months
- WACC calculation (CAPM) and terminal value options
04. Scenarios
The Scenarios tab is a six-case matrix: Base, Upside, Downside, Lender Base, Lender Downside and Severe Downside. Each lever is picked live with INDEX formulas, and operations, construction, financing, macroeconomic and tax cases can be mixed independently. Stored results from full model runs let you compare IRR, NPV and DSCR across all cases side by side.
- Six cases covering operational, commercial, construction, OPEX, financing and macroeconomic levers
- Each block can be overridden independently with its own case
- Standard, incentivised and adverse tax cases
- Stored full-model results for every scenario
- Inputs are clearly separated from live values
05. Design & Capacity
The Design & Capacity tab sets out the engineering basis of the CO2 terminal: berths, jetties, storage tanks, pumps, compressors, pipelines and shipping. It calculates nameplate, marine, pumping and pipeline limits, identifies the bottleneck, and applies availability and operating efficiency to give the effective annual capacity used throughout the model.
- 6.0 Mtpa nameplate design, with 12 tanks totalling 180 kt of gross storage
- Berth capacity based on turnaround time and occupancy
- Automatic bottleneck identification
- Available and effective capacity in tonnes per year, month and day
- Capacity reconciliation and utilisation by period
06. CO2 Supply
The CO2 Supply tab models emitters delivering CO2 to the hub from cement, steel, chemicals and waste-to-energy plants. Contracted and merchant supply is shaped by ramp-up, monthly seasonality, capture plant availability, supply interruptions and customer default. CO2 quality specifications and off-spec rejections give an accepted CO2 volume for the terminal.
- Supplier table with location, capture technology, rating and delivery mode
- Inbound split between vessel and pipeline
- Ramp-up load factor and monthly seasonality profile
- CO2 purity, water, O2, N2 and sulphur specification checks
- Contracted, merchant, rejected and accepted supply
07. Throughput
The Throughput tab is the volume engine of the LCO2 terminal. Inbound receipts are capped at effective capacity, and handling, storage, rehandling, loading and dispatch volumes are tracked. Outbound flows by vessel and pipeline are calculated from target inventory. A full CO2 mass balance check runs every period.
- Inbound CO2 received by vessel, pipeline and other modes
- Curtailment of supply above capacity
- Opening inventory, losses, outbound flows and closing inventory, with a mass balance check
- Take-or-pay, contracted, uncontracted and merchant volumes
- Annualised throughput, utilisation and peak daily throughput
08. Storage & Inventory
The Storage & Inventory tab tracks the LCO2 tank farm: inflows, transfers, dispatches, boil-off and evaporation losses. It reports average and peak inventory, residence time, storage turnover, inventory days and tank utilisation. Storage costs are allocated to give a cost per tonne, and four storage revenue streams are calculated.
- Inventory roll-forward that ties to the throughput mass balance
- Residence time, turnover and inventory days
- Boil-off, evaporation and operational losses
- Storage capacity, volume, duration and inventory revenue
- Storage cost per tonne KPI
09. Shipping & Logistics
The Shipping & Logistics tab models the CO2 shuttle fleet and the hub’s marine operations. Vessel calls drive berth occupancy, waiting times and demurrage. Voyage durations set fleet capacity, and any overflow goes to third-party freight. The tab calculates charter, bunkering, port, pilotage, tug and mooring costs, along with marine handling and freight revenue.
- Inbound and outbound vessel calls by period
- Fleet capacity based on distance, speed, voyage time and availability
- Berth occupancy, waiting time and demurrage days
- Itemised shipping costs and bunker fuel cost
- Loading, unloading, marine handling, port service and freight revenue
10. Utilities
The Utilities tab calculates the terminal’s energy and utility costs by process: general load and grid charges, refrigeration, pumping and BOG compression. It also covers water, wastewater, backup generator fuel and other utilities. Each cost combines specific consumption, volumes and escalated prices, giving total utilities cost and cost per tonne of CO2.
- Electricity demand in MWh and MW, by process
- Refrigeration, pumping and compression power plus maintenance
- Water, wastewater and diesel fuel costs
- Nitrogen, instrument air, cooling water and firewater
- Utilities cost per tonne KPI
11. Availability & Losses
The Availability & Losses tab turns planned, unplanned, mechanical, electrical, marine and weather downtime into terminal, equipment and marine availability. CO2 loss rates for boil-off, handling, transfer, loading and unloading produce loss volumes for the mass balance and the EU ETS environmental levy.
- Downtime hours converted to availability percentages
- Operating efficiency metrics
- Six CO2 loss rates with a scenario multiplier
- Loss volumes by type in kilotonnes
- Maintenance and operational risk indicators
LCO2 Terminal CCS Project Financial Statements
12. Contracts
The Contracts tab is the commercial register for the CO2 hub. It holds Terminal Use Agreements (TUAs) with each emitter, plus the EPC, O&M, PPA and vessel charter contracts. Contract terms, expiry dates, renewal rates, capacity reservation and take-or-pay terms produce a contracted capacity profile, with expired volumes re-marketed as merchant volume.
- Contract register covering IDs, counterparties, terms and expiry dates
- Supplier and customer agreements with throughput-weighted tariffs
- Capacity reservation and take-or-pay minimum payments
- Customer and supplier concentration risk
- Contracted capacity profile, including renewals
13. Revenue Build-up
The Revenue Build-up tab calculates each LCO2 terminal revenue stream as volume × escalated tariff. Throughput, storage, shipping, capacity and other revenue are split into contracted and merchant, and into fixed and variable. Discounts, availability service credits and penalties are deducted to reach net revenue, with revenue per tonne and growth KPIs.
- Receipt, unloading, handling, transfer and dispatch revenue
- Storage, shipping and capacity reservation revenue
- Take-or-pay shortfall and minimum payment top-ups
- Contracted vs merchant revenue analysis
- Reconciliation from gross to net revenue
14. CAPEX
The CAPEX tab contains a detailed initial capital cost estimate of about $1.29 billion for the CO2 terminal. It covers development, marine, storage, handling, refrigeration, utilities, infrastructure, engineering and other costs. Scenario factors apply EPC overruns, contingency and delay costs, and sustaining, overhaul and lifecycle CAPEX are scheduled over the operating life.
- More than 50 CAPEX line items, each with its own spend profile
- EPC overrun, contingency and delay cost adjustments
- Sustaining, tank maintenance, pipeline and overhaul CAPEX
- CAPEX per annual tonne of capacity
- Total initial and total project CAPEX outputs
15. Construction Schedule
The Construction Schedule tab spreads CAPEX monthly using S-curve, straight-line, front-loaded and back-ended profiles that adjust automatically when construction takes longer. It also tracks construction milestones and package values, planned progress, funding drawdowns, capitalised financing costs and construction risks such as liquidated damages.
- Monthly CAPEX by package and payment type
- Spend profiles that adjust when the timeline changes
- Pro-rata equity, shareholder loan, senior debt and grant drawdowns
- IDC, commitment, arrangement and upfront fees
- Construction risk and total project cost at COD
16. OPEX
The OPEX tab builds operating costs for the LCO2 terminal by category: personnel, maintenance, marine and fleet, utilities, insurance, administration, environmental and other costs. Each line is escalated by its own index and flexed by OPEX scenario factors, giving total, fixed and variable OPEX and OPEX per tonne.
- FTE-based salaries, wages and benefits
- Maintenance costs as a percentage of EPC cost, plus fixed items
- Port, harbour, tug, charter and bunkering costs
- Property, local tax and ETS levies
- Fixed vs variable split and OPEX per tonne
17. Working Capital
The Working Capital tab calculates receivables, payables, prepayments, VAT, deposits, accruals and CO2 inventory using days-based assumptions. Net working capital and its period-by-period change flow to the cash flow statement. Initial working capital is funded at COD, and all balances unwind in the terminal period.
- Receivables split into contracted, merchant, storage and other
- Payables split into supplier, utility, maintenance and marine
- VAT receivable and payable
- Net working capital and its cash flow impact
- Peak working capital requirement
18. Fixed Assets & Depreciation
The Fixed Assets tab keeps an asset register across eight classes, including marine, storage, handling, utilities, infrastructure, development, capitalised financing and sustaining assets. Shared costs are allocated to each class and grants are netted off. Straight-line depreciation by useful life produces gross asset, accumulated depreciation and net book value schedules.
- Asset register with useful lives, depreciation method and residual values
- Allocation of shared and contingency costs
- Capitalised interest during construction
- Depreciation and amortisation by class
- Net book value roll-forward with checks
19. Tax Schedule
The Tax Schedule tab models corporate income tax with tax depreciation, an EBITDA-based interest limitation with carry-forward, and loss carry-forward subject to a utilisation cap. It also covers capital allowances, deferred tax, tax payment timing, withholding taxes, property tax and environmental levies on vented CO2.
- Levered and unlevered tax depreciation
- Interest deductibility limit with carry-forward of disallowed interest
- Tax losses with a threshold and percentage limitation
- Current and deferred tax, and cash tax paid
- Effective tax rate output
20. Income Statement
The Income Statement presents revenue by stream, operating costs by category, gross profit, EBITDA, depreciation, amortisation, EBIT, finance costs, interest income, profit before tax, taxation and net income. Margins and growth KPIs are shown for each financial year of the LCO2 terminal’s life.
- Eight revenue lines and eight cost categories
- EBITDA, EBIT and net profit margins
- Construction interest is capitalised; fee amortisation is shown
- Current and deferred tax
- Annual revenue and EBITDA growth
21. Balance Sheet
The Balance Sheet shows non-current assets by class, restricted reserve cash, current assets, equity, senior debt split between its current and non-current portions, shareholder loans, deferred tax and current liabilities. A balance sheet check confirms that assets equal liabilities plus equity in every period.
- PP&E split by marine, storage, handling and utilities
- DSRA and MMRA restricted cash
- Current portion of debt based on the next 12 months of repayments
- Retained earnings net of dividends
- A balance check in every period
22. Cash Flow Statement
The Cash Flow Statement reconciles operating, investing and financing cash flows to the closing cash balance. A full distribution waterfall runs through CFADS, senior debt service, reserve funding, lock-up tests, cash sweep and shareholder loan repayment before any dividends are paid.
- Operating, investing and financing cash flows
- Unlevered FCF, levered FCF, CFADS and cash available to equity
- DSCR lock-up and minimum cash tests
- Optional cash sweep to senior debt
- Shareholder loan repayments and dividends
23. Sources & Uses
The Sources & Uses tab summarises total project funding to COD. Uses cover CAPEX by category, financing fees, capitalised interest, initial working capital and DSRA funding. Sources cover senior debt, shareholder loans, sponsor and third-party equity and grants. The tab reports funding ratios and checks that sources equal uses.
- Fourteen project use categories
- Debt, equity, shareholder loan and grant sources
- Gearing, debt-to-equity and debt-to-CAPEX ratios
- Equity contributions during development and construction
- Check for any funding surplus or shortfall
24. Debt Schedule
The Debt Schedule tab models a senior term loan. Drawdowns are pro-rata, interest and fees during construction are added to the loan balance, and commitment, arrangement, upfront and agency fees are calculated. Repayments can be sculpted or straight-line, with balloon and sweep options. It also includes the interest calculation, debt service, deferred financing costs and the shareholder loan balance.
- Debt drawdowns with capitalised interest
- Sculpted or straight-line repayment profiles
- Cash interest and fee schedules
- Debt-to-EBITDA, debt-to-CAPEX and DSCR ratios
- Shareholder loan roll-forward
25. Reserve Accounts
The Reserve Accounts tab funds and manages the Debt Service Reserve Account (DSRA) against forward scheduled debt service, including the initial funding at COD, top-ups, withdrawals and releases. A Major Maintenance Reserve Account (MMRA) builds up funds for overhauls. The tab also shows operating cash reserves and placeholder lines for other reserves.
- DSRA requirement, funding, withdrawals and releases
- DSRA shortfall and surplus tracking
- MMRA contributions and withdrawals
- Restricted cash totals for the balance sheet
- Reserves split by funding source
LCO2 Terminal Key KPIs
26. Project DCF
The Project DCF tab calculates the unlevered free cash flow of the LCO2 terminal using unlevered tax, sustaining CAPEX and working capital movements. Cash flows are discounted at WACC with a mid-period option. Three terminal value methods are available, and the outputs are enterprise value, Project NPV, Project IRR and payback periods.
- NOPAT to unlevered free cash flow bridge
- Unlevered tax with loss carry-forward
- Date-based discount factors
- Net book value, exit multiple or annuity terminal value
- Project IRR, NPV, EV and discounted payback
27. Equity DCF & Returns
The Equity DCF tab tracks shareholder cash flows: contributions, dividends net of withholding tax, shareholder loan repayments and exit proceeds. It calculates Equity IRR, NPV at the cost of equity, MOIC and payback. It also includes a distribution waterfall, sponsor and third-party returns, and an exit valuation.
- Equity cash flow and levered free cash flow bridge
- Equity IRR, NPV, MOIC and payback
- Sponsor vs third-party investor returns
- Exit valuation net of debt and transaction costs
- Check reconciling the equity cash flow to cash
28. Debt Sizing & Covenants
The Debt Sizing tab calculates CFADS and sizes senior debt to the lowest of the DSCR, LLCR, PLCR, gearing and leverage limits. A non-circular approach, based on a debt profile at 100% gearing, makes this possible. Repayments are sculpted to a target DSCR, and DSCR, LLCR and PLCR are tested against lender covenants.
- CFADS and a separate sizing CFADS
- Debt capacity under each sizing constraint
- Option to size live or fix the Lender Base Case debt amount
- Annual DSCR, LLCR and PLCR
- Covenant compliance and lender outputs
29. Sensitivities
The Sensitivities tab gives live one-way sensitivities across operating, commercial, CAPEX, OPEX, construction, financing and macroeconomic drivers, showing NPV and IRR in low and high cases. Six two-way tables and a lender table show how debt capacity responds. A combined scenario summary compares all six stored cases.
- More than 40 one-way sensitivity drivers
- Throughput vs tariff and CAPEX vs delay IRR tables
- WACC vs terminal value NPV table
- Interest rate vs tenor debt capacity table
- Stored combined scenario results
30. Dashboard
The Dashboard gives a one-page investor and lender summary. It covers the project overview and operational, commercial, financial, valuation, financing, lender and cash flow KPIs, with values converted to the selected reporting currency. An annual summary feeds nine charts, including throughput, revenue, EBITDA, CAPEX, debt and returns.
- KPIs shown in USD, EUR or GBP
- Stabilised Year 5 operating metrics
- Valuation and lender KPIs in one view
- Scenario comparison table
- Nine dashboard charts
31. Model Checks
The Model Checks tab runs more than 70 integrity tests covering formula errors, missing inputs, hardcodes, timeline, mass balance, revenue, CAPEX, OPEX, working capital, financial statements, debt, reserves, valuation and funding. It also runs per-period checks. Covenant checks are reported separately, and the results roll up into an overall PASS or REVIEW status.
- Formula error and broken reference counts
- Mass balance, balance sheet and cash reconciliation checks
- Debt, reserve and funding checks
- Valuation and IRR cross-checks
- Overall model integrity status
Why Buy This Model
Building a bankable LCO2 terminal or CCS shipping hub model from scratch can take weeks of specialist modelling. This model gives you a complete, structured and fully linked starting point from day one. It covers the CO2 supply chain, terminal operations, shipping and full project finance mechanics, with integrated financial statements, lender-style debt sizing and sculpting, reserve accounts, valuation and scenario analysis. It follows professional formatting conventions, with colour-coded inputs, formulas and links, one formula-driven timeline and more than 70 integrity checks, so lenders, investors and reviewers can follow and trust the logic. Replace the illustrative inputs with your project data and you have a model ready for investment decision and lender discussions.
LCO2 Terminal Frequently Asked Questions
Q: What type of project is this model designed for?
A: It is designed for a liquefied CO2 (LCO2) import, storage and export terminal acting as a CO2 shipping hub for carbon capture and storage (CCS). The base case is a 6.0 Mtpa terminal funded through a project finance SPV. You can adapt it to other capacities, locations and terminal set-ups by changing the inputs.
Q: Can I change the capacity from 6 million tonnes per annum?
A: Yes. Nameplate capacity, tank numbers and sizes, berths, pumping and pipeline capacity are all inputs on the Design & Capacity tab. The model identifies the bottleneck automatically and recalculates effective capacity, throughput, revenue and costs.
Q: What happens if I change the project start date?
A: Every date in the model updates automatically. You change one cell, the Model Start Date on the Timeline tab, and all headers, milestones, CAPEX phasing, operating periods, debt schedules and escalation indices re-date themselves.
Q: What is the time structure of the model?
A: Construction runs for 2 years in monthly periods. Operating Years 1–5 are monthly, with an FY Total column for each year, and Operating Years 6–20 are annual. Monthly columns can be collapsed to show a clean annual view.
Q: Does the model use circular references or macros?
A: No. Debt sizing, interest during construction and fees are calculated without circularity using a debt profile at 100% gearing, so you don’t need iterative calculation. There are no macros, and everything is transparent Excel formulas.
Q: How is the debt sized?
A: Senior debt is sized to the lowest of the DSCR, LLCR, PLCR, maximum gearing and maximum debt-to-EBITDA limits, then sculpted to the target DSCR. You can size debt on the selected scenario, or fix it at the Lender Base Case amount, which is standard lender practice.
Q: Is the model suitable for presenting to banks and lenders?
A: Yes. It includes a Lender Base Case and Lender Downside Case, CFADS, annual DSCR, LLCR, PLCR, DSRA and MMRA reserve accounts, a distribution lock-up and covenant compliance tests. These are the outputs lenders expect in a project finance model.
Q: What scenarios are included?
A: There are six cases: Base, Upside, Downside, Lender Base, Lender Downside and Severe Downside. Each covers operational, commercial, construction, OPEX, financing and macroeconomic levers. You can also mix cases, for example base operations with lender downside financing.
Q: Which revenue streams are modelled?
A: The model includes CO2 receipt, unloading, handling, transfer, dispatch, storage, vessel loading and unloading, marine handling, port services, freight, capacity reservation, take-or-pay and ancillary revenue. All tariffs escalate, and revenue is split between contracted and merchant.
Q: Does it include take-or-pay contracts?
A: Yes. Terminal Use Agreements include contracted capacity, take-or-pay percentages, shortfall payments, minimum annual payments, contract expiry and renewal rates, and customer default assumptions.
Q: What returns does the model calculate?
A: Project IRR, Project NPV, Enterprise Value, Equity IRR, Equity NPV, Equity MOIC, sponsor and third-party IRRs, and discounted and undiscounted payback periods.
Q: Can I see results in currencies other than USD?
A: The model calculates in USD. The dashboard can show KPIs in USD, EUR or GBP using the reporting currency selector, and the model also flexes the FX exposure of costs incurred in EUR.
Q: How are taxes handled?
A: The model includes corporate tax with straight-line tax depreciation, an interest deductibility limit with carry-forward, tax losses with a utilisation cap, capital allowances, deferred tax, dividend withholding tax, property tax and environmental levies. Three tax cases are included: Standard, Incentivised and Adverse.
Q: Are the assumptions based on a real project?
A: No. The inputs are realistic but illustrative placeholders, including supplier names, location, tariffs and costs. They are designed to be replaced with your own project data. All inputs are clearly marked in blue on a yellow background.
Q: How do I know the model is working correctly?
A: The Model Checks tab runs more than 70 checks, including the balance sheet, the CO2 mass balance, cash reconciliation, sources and uses, debt repayment, IRR cross-checks and formula error counts. It rolls them up into an overall PASS or REVIEW status, which is also shown on the Cover tab.
Q: Can I run sensitivity analysis?
A: Yes. The Sensitivities tab includes more than 40 live one-way sensitivities, six two-way tables (such as throughput vs tariff and CAPEX vs construction delay), and a lender table showing how debt capacity changes with interest rate, tenor and DSCR.
Q: What version of Excel do I need?
A: A modern version of Microsoft Excel (Excel 2019 or Microsoft 365) is recommended. The model uses standard functions such as XIRR, SUMPRODUCT, INDEX/MATCH and MINIFS.
Q: Is this model suitable for an investment committee or FID?
A: Yes. It was built for investment decisions and lender financing, with a clear structure, documented assumptions, scenario and sensitivity analysis, and a summary dashboard suited to investment committee papers.
Final Notes on the LCO2 Terminal Financial Model
This 20-Year LCO2 Terminal Financial Model helps to focus on balancing capital expenditures with steady revenue growth from diversified distribution services. By optimizing operational costs, power efficiency, and maximizing high-margin services, the model ensures sustainable profitability and cash flow stability.