On-Premise IT Network To Cloud Upgrade Templates

MS Project, Excel and PowerPoint files to help plan an IT Network to Cloud Upgrade, and an on-premise to cloud and multiple apps to cloud migration.

Directorates for an On-Premise IT Network to Cloud Upgrade

The Cloud migration requires structured directorates to ensure seamless execution. Key focus areas include:

  • Network Development Plans

    • Assessment & Inventory: Audit existing IPv4 infrastructure to identify dependencies.

    • Phased Migration Strategy: Prioritize critical systems for early IPv6 adoption.

    • Stakeholder Alignment: Engage IT, security, and business units for unified goals.

  • Infrastructure Design Timeline Templates

    • Hardware & Software Readiness: Upgrade routers, switches, and firewalls for dual-stack support.

    • Cloud Integration: Align AWS/Azure with IPv6 while maintaining hybrid compatibility.

    • *SD-WAN & IPv6 Expansion*: Deploy Cisco SD-WAN solutions to optimize IPv6 traffic routing.

Project Artefacts for Cloud Transition

Documentation and structured plans are critical for compliance and efficiency. Key artefacts include:

  • On-Premise Network To Cloud Transition Plans (On-Prem & Cloud)

    • Dual-Stack Deployment: Run IPv4/IPv6 concurrently during migration.

    • Cloud-Based Transition: Leverage AWS Native IPv6 and Azure IPv6 peering.

  • Training Rollout Plan

    • Technical Workshops Timeline Examples: Cisco certifications for engineers on IPv6 routing.

    • End-User Awareness: Sessions on IPv6 addressing and security implications.

  • Compliance Testing & AD DS Timeline

    • RFC & Regulatory Checks: Validate against NIST & IETF standards.

    • Active Directory Upgrades: Schedule AD DS updates for IPv6 DNS and DHCP support.

IPv4 to IPv6 Network Upgrade
IPv4 to IPv6 Network Upgrade
IPv4 to IPv6 Network Upgrade

Migrating an enterprise-scale on-premise network to the Cloud with Multiple Apps

Excel template project timeline roadmap including over 1800 editable datelines to align task dependencies across infrastructure transformation, cloud provisioning, IP address redesign, and application replatforming. The Benefits Realization Planning Template becomes essential for tracking tangible outcomes such as improved scalability, simplified routing, and enhanced security with IPv6 adoption. A well-structured Escalation Matrix with RAG (Red, Amber, Green) Status must be integrated into the project controls to flag critical path deviations, delays in vendor deliverables, or bottlenecks in application modernization phases. Cloud migration is often staged by application grouping (e.g., customer-facing, internal tools, finance apps) and requires a tailored transition approach for each, leveraging dual-stack IP addressing and optimized routing policies for IPv6-capable services.

To help manage the scale and complexity of such a program,  supporting artefacts such as an Excel RAID Log (Risks, Assumptions, Issues, Dependencies) and an Excel RACI Matrix (Responsible, Accountable, Consulted, Informed) are essential for governance clarity and are included in MS Excel format. A Software Modernization Onboarding framework enables teams to update legacy systems to cloud-native architectures with IPv6 compatibility, while the Mobile Team Finance Tracker helps monitor distributed costs across engineering squads. IP Addressing is a central architectural pillar—requiring meticulous subnetting, reallocation of deprecated IPv4 addresses, and assignment of new IPv6 blocks across cloud regions and virtual networks. Additionally, the Project Data Test & Transfer (Solution Scoping Communications Plan) outlines how data integrity, application performance, and user access continuity will be validated and communicated at each transition stage. These artefacts ensure that every application, network zone, and stakeholder is mapped, migrated, and supported effectively throughout the transformation.

IT Network to Cloud Upgrade

The expansion of SD-WAN in cloud environments

As organizations adopt the cloud to future-proof their networks, integrating it with SD-WAN enables intelligent, policy-driven traffic routing across multiple cloud and hybrid environments. This convergence improves application performance, simplifies IP address management, and supports seamless communication between cloud-native and on-premises systems. SD-WAN’s built-in security features—combined with IPv6’s end-to-end addressing—enhance visibility, encryption, and compliance, especially for globally distributed teams and services. To ensure a smooth transition and implementation, a structured assessment and planning process is required.

Network Assessment Templates

  • Evaluate current WAN architecture and cloud connectivity

    • Identify gaps in IPv6 support for edge and core devices

    • Validate MPLS, broadband, LTE, and cloud integration compatibility

Network Inventory

  • Catalog all physical and virtual network devices

    • Routers, switches, firewalls, and load balancers

  • Include firmware versions and IPv6 readiness

    • Highlight devices requiring upgrades or replacement

Network Topology Mapping

  • Diagram current network layouts (on-premise and cloud)

    • Logical and physical topologies

  • Map traffic flow and interconnectivity points

    • Highlight IPv4-only links or legacy constraints

Security Assessment

  • Review security policies for IPv6 integration

    • IPv6 firewall rule sets, ACLs, and IDS/IPS compatibility

  • Assess encryption protocols and VPN support over IPv6

Network Traffic Analysis

  • Baseline network traffic patterns

    • Application, protocol, and bandwidth utilization

  • Detect IPv6 vs IPv4 traffic behavior

    • Identify dual-stack performance anomalies

Apps To Cloud Capabilities Evaluation

  • Review vendor support and cloud provider IPv6 capabilities

    • Azure, AWS, GCP native IPv6 readiness

  • Assess team skills and training needs for IPv6 operations

SD WAN IPv4 to IPv6 Network Upgrade

On-Premise Network To Cloud and IPv4 to IPv6 Miscellaneous Files:

Miscellaneous files and artefacts—in Excel, PowerPoint, and Word formats—Apps To Cloud Environment and IPv4 to IPv6 migration project. These templates and documents support planning, tracking, reporting, governance, and stakeholder communication across the program lifecycle:

Excel Files for On-Premise Network To Cloud Migration

  • Benefits Realization Planning Template

    • Track benefits by category (technical, financial, operational)

    • Map benefits to project milestones and IPv6 adoption phases

    • Include metrics for scalability, performance, and compliance

  • Escalation Matrix with RAG Status

    • Define escalation levels by issue severity

    • Assign contacts per escalation tier

    • Use RAG (Red-Amber-Green) indicators for live tracking

  • Mobile Team Finance Tracker

    • Budget breakdown by team, app, and migration wave

    • CapEx vs OpEx tracking

    • Currency, rate, and forecast variance columns

  • Project Data Test & Transfer (Solution Scoping Communications Plan)

    • Track systems/data owners, migration windows

    • Communication channels and messaging timeline

    • Verification checkpoints and rollback strategies

  • RAID Log (Risks, Assumptions, Issues, Dependencies)

    • Categorize by phase: Planning, Testing, Cutover, Hypercare

    • Assign owners and mitigation actions

    • Include impact ratings and closure dates

  • RACI Matrix

    • Define roles: Responsible, Accountable, Consulted, Informed

    • Map responsibilities to key deliverables (e.g., IPv6 config, dual-stack rollout)

    • Include stakeholder group mappings

  • Software Modernisation Onboarding Tracker

    • App inventory with modernization status

    • IPv6 readiness indicators (network stack, DNS, APIs)

    • Team assignments, blockers, and onboarding status

PowerPoint Presentations

  • Escalation Matrix Slide

    • Visual matrix with escalation paths by severity

    • Contacts with response timelines

    • RAG color coding and contact hierarchy

  • Plan on a Page (POaP) – End-to-End SDLC for On-Premise Network To Cloud

    • Visualize all key SDLC phases (Plan → Design → Deploy → Operate)

    • Show IPv6 dependencies and integration points

    • Include security and change management lanes

  • POaP – Network Resources

    • Timeline view of resource allocation (engineers, architects, vendors)

    • Include peaks by project stage (testing, migration, hypercare)

  • POaP – ART Scaled Agile Framework

    • Use Scaled Agile (SAFe) model to track delivery cadence

    • Highlight Program Increments, Agile Release Trains (ARTs), and integration plans

    • Reflect CALMR principles on a Continuous Delivery Pipeline (CDP)

  • Plan on a Page – Network Upgrade

    • One-page snapshot of IPv4 to IPv6 migration journey

    • Cloud, on-premise, and hybrid tracks

    • Legacy network decommissioning stages

MS Word Documents

  • Benefits Review Plan

    • Outline when and how benefits will be measured post-migration

  • Business Case

    • Define strategic justification for IPv6 migration

    • Include technical drivers, cost breakdown, and risk-benefit analysis

  • Issue Register

    • Active list of current project issues

    • Dates raised, impact, and assigned resolution

  • Issue Report

    • In-depth reporting of high-priority issues

    • Background, impact analysis, and resolution approach

  • Lesson Log

    • Ongoing log of lessons during IPv6 transition

    • Phase and context-based categorization

  • Lessons Report

    • Consolidated post-implementation review document

    • Key learnings and process improvement suggestions

  • Plan Master

    • Centralized document referencing all linked plans and sub-plans

    • Includes change log and version history

  • Project Report

    • Periodic reporting document for governance bodies

    • Tracks KPIs, schedule adherence, and upcoming milestones

 

IPv4 to IPv6 Network Upgrade AD DS Timeline
IT Network to Cloud Upgrade
IT Network to Cloud Upgrade
IT Network to Cloud Upgrade
IPv4 to IPv6 Network Upgrade Excel Template
IPv4 to IPv6 Network Upgrade Financial Plan
IPv4 to IPv6 Network Financial Plan Excel
IPv4 to IPv6 Network Upgrade PowerPoint Slide
IT Network to Cloud Upgrade
PowerPoint Slides To Help IPv4 to IPv6 Network Upgrade
IT Network to Cloud Upgrade

Final Notes on the On-Premise Network To Cloud Network Upgrade

This 40 Plus template collection helps in upgrade planning by optimising operational efficiency and power efficiency, and maximising high-margin services like cloud upgrade and managed offerings, these templates ensure sustainable profitability and cash flow stability.